
Full Name: Pushpakumar Mahendra Wickramasinghe
Name with initials: P. M. Wickramasinghe
Short name: Kumar Wickramasinghe
Membership Category: Fellow
Membership Number: F 003
Educational qualifications: B.Sc. Engineering
Professional Qualifications: C Eng. (UK), MIET
Occupation: Consulting Engineer
Area of activity: Building Services Design
Area of Competency: Electrical/ ELV Services
Official address:
M. Wickramasinghe
PROMAC Engineers,
435/14, Longdon Hill, Thimbirigasyaya Road,
Colombo 05, Sri Lanka.
Postal code: 00500
Email: kumar.wickramasinghe@gmail.com
Web:
Telephone: +94 (0)11 250 3214
Mobile: +94 (0)77 233 9027
Experience:
Over 40 years of extensive experience in designing, setting up, management and maintenance of facilities in the fields of Satellite Communications, CFL and Petro-Chemical Manufacturing (Acrylic Fibre/Ammonia Urea), Industrial Utilities, Telecommunication Systems, Instrumentation Systems and ELV Systems, in Sri Lanka, and abroad.
Consulting engineer – Designing ELV systems for Hotel properties, Energy Management of large Chilled Water installations and buildings, pier reviewing ELV system and Electrical system designs.
Project Engineering Manager of a 250M US$ Acrylic Fibre plant in Indonesia was responsible for the project management and installation of the entire Electrical System (20MW), the Instrumentation System (Foxboro IA Series Control System), and a 1.2 MVA dual conversion UPS System.
Project Manager responsible for setting up of a Satellite Earth Station in Sri Lanka and continued as AGM Technical.
As a Telecommunication Engineer carried out the final acceptance of Telecom Exchanges, Microwave Links, Air Conditioning and Power Generation System on behalf of Saudi Telecom.
Instrumentation Engineer at State Fertilizer Manufacturing Corporation in Sri Lanka, carried out installation, commissioning and maintenance of the Utility Plant of the 946 MTPD Ammonia Urea Complex. Consisted of Water Clarification, Filtration and Demineralisation Plants for 100 Bar-100 Tons/Hr and 40 Bar-65 Tons/Hr boilers, 7 MW Turbo Generator, 3000 Ton Liquid Ammonia Storage at -330 C, Liquid Nitrogen Plant (Storage at -1960 C), 25,000 Ltr. LPG Storage, two 40 Bar 65Tons/Hr. Boiler Plants, Drinking Water Purification Plant, and the Cooling Towers for the entire Ammonia Urea Plant including 240kg/Hr Liquid Chlorine Dosing System.